1) EXSISTING FLAT ROOF MATERIALS ARE STRIPPED OFF AND CLEARED FROM THE SITE.
i.e. VEGETATION,
STONES,ASHPHALT,FELT AND CHIPBOARD.
BITUMEN WOULD HAVE BEEN STUCK TO THE CHIPBOARD
LEAVING BOARD SURFACE USELESS.
2) TIMBERS ARE CHECKED FOR ROT AND CORRECT FALLS.
3) THE AREA IS RE-DECKED USING BBA APPROVED STERLING BOARD SCREWED INTO THE TIMBERS. (British Board of Agrement certificate number..92/2781.)
4) PRE-FORMED MACHINE MADE GRP TRIMS ARE FITTED
AROUND THE EDGES OF THE ROOF TO ENSURE THE WATER
IS DISPLACED CORRECTLY.
5) THE GRP SYSTEM IS THEN FITTED TO THE BOARDS AS A WET FORM (A LAYER OF RESIN A LAYER OF GLASSFIBRE MATTING AND THEN ANOTHER LAYER OF RESIN). IT IS THEN LEFT TO DRY OR GO OFF DUE TO THE CHEMICAL REACTION OF THE CATALYST OR HARDENER.THIS WILL ONLY TAKE A FEW MINUTES. NO HEAT OR FLAME TORCHES ARE USED.THE SYSTEM IS NOW LITERALLY STUCK TO THE BOARDS.
6) THE SYSTEM IS FINISHED WITH A POLYESTER FLO COAT.A ROBUST HARD WEARING DURABLE TOPCOAT WHICH CAN BE PIGMENTED TO MANY DIFFERENT COLOURS .